What’s Happening With the Key Bridge

Potomac River

Recently a flotilla of barges appeared at the foot of the Key Bridge. They are there to assist in the rehabilitation of the bridge, which is just now kicking off. But what is being done for the project?

Most of the tasks are maintenance-oriented. According to a flyer produced by the BID they include:

screen-shot-2017-01-08-at-7-13-32-pm

At some point, GM heard they were considering painting the bridge, but it doesn’t seem that that will be included. Also not (apparently) in the plans is the idea to install programmable lights that could turn the bridge into DC’s own light show stage (a la the Empire State Building).

If you want to learn more about the construction, and how it might affect your use of the bridge, keep your eyes out for an upcoming meeting from CAG on the topic.

Advertisements

Leave a comment

Filed under Uncategorized

Leave a Reply

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s