Tag Archives: Q St.

The Georgetown Metropolis

2300 block of Q St.

Advertisements

Leave a comment

Filed under The Georgetown Metropolis

Q St. Construction to Last Until March

Photo by Pinelife.

WASA–now branded “DC Water”–has been conducting major construction on Q St. for about a year. ┬áThe construction entails separating the sewer systems into two systems: sanitary and storm. As it is now, all sewage, whether from a toilet or a storm grate, goes into the same pipe. When it rains a lot (like yesterday) that pipe gets backed up and the overflow (including all that stuff from the toilets) is drained into Rock Creek. The EPA sued WASA over this and WASA is under a court order to fix it by separating the pipes to make sure sanitary sewage never is dumped into Rock Creek.

When WASA was considering this project, they kicked around a couple ideas for how to conduct the massive project on Q St. They considered shutting the road down completely or just shutting it down to one lane. Finally they settled on allowing two lanes of traffic at all times. The last GM heard about this (which was a little before construction started) the project was supposed to run from about October 2009 until September 2010. Continue reading

2 Comments

Filed under Development

The Georgetown Metropolis

3100 block of Q St.

Leave a comment

Filed under The Georgetown Metropolis

The Georgetown Metropolis

3100 block of Q St.

Leave a comment

Filed under The Georgetown Metropolis

The Georgetown Metropolis

3000 block of Q St.

Share

Leave a comment

Filed under The Georgetown Metropolis

The Georgetown Metropolis

3000 block of Q St.

Share

Leave a comment

Filed under The Georgetown Metropolis

The Georgetown Metropolis

3000 block of Q St.

Share

Leave a comment

Filed under The Georgetown Metropolis